![](https://www.gephartelectric.com/wp-content/uploads/2024/05/3M-Hours-No-Lost-Time-380x209.jpg)
05.24
Minneapolis, MN
Working with general contractor RJM Construction, Gephart Electric will be upgrading the 11-story Ford Centre in Minneapolis into a Class A-type office building. Originally built in 1913, the revitalized Ford Centre will have new, energy efficient windows, a new entry off the visitor parking lot, a new main-level hallway with 18-foot ceilings, and new elevators and mechanical systems. Work is expected to be completed Summer 2012.